attached is a file with some sketches from OEKM to redefine their Unit Results
attached is the presentation of our team that we gave, when OEKC met the DDG
Attached is a first proposal for a "content model" for the implementation / documentation of the workplan in a sharing environment like the AIMS platform. This model is based on the...
Please join this community on AIMS to define our workplan for the next 2 years. The pages of the group will show the main material and "construction sides" for the PWB. Everyone can post...
a href="http://www.phase2technology.com" Phase2 Technology | Open Source. Open Minds./abr /I want to draw the attention to Phase2Technology and their products OpenPublish and Tattler.nbsp; Both...